100 Polymer Non‑Bituminous Self‑adhesive Underlayment Membrane takes synthetic polymer sheet (HDPE) as base film, with single‑sided high polymer self‑adhesive layer and anti‑sticking layer, designed for pre‑lied anti‑bonding construction. After consolidated between waterproof with cast‑in‑place concrete slurry, it forms gapless bonding between waterproof layer and concrete structure, eliminating interlayer water channeling and improving waterproof system reliability.
Apply to underground bottom slabs and externally waterproofed internally adhered side walls of civil & industrial buildings, as well as subways, nuclear power plants, urban utility tunnels, open‑cut tunnels and mined tunnels.

《Pre‑applied Waterproofing Sheets》 GB/T 23457‑2025 (P‑Type)
‑Multi‑layer composite self‑adhesive waterproof membrane composed of high polymer sheet, synthetic adhesive layer and environmental flexible coating, with comprehensive superior performance. ‑Wet‑bonding technology: cement slurry reacts with polymer adhesive layer during concrete pouring, forming permanent organic bonding with structural concrete without water channeling risk. Even local damage confines water within a limited area. ‑Laid loosely on substrate, free from impact of base settlement and deformation. ‑Excellent impact and puncture resistance. Withstands construction loads and rebar frame impact; direct concrete pouring without extra protection layer. ‑Strong self‑healing property of synthetic adhesive and outer elastic coating layer, uniquely capable of self‑repairing minor construction damage. ‑Strong chemical corrosion resistance against alkaline water from concrete, immune to domestic waste and biological attack, mildew‑proof and corrosion‑resistant. ‑Wet construction without leveling layer required, low substrate requirement. Unaffected by weather and damp substrate, ideal for rainy‑season and rush projects. ‑Simple surface treatment: no primer or hot air drying for damp base, no volatile substances. ‑No time‑consuming and costly cement mortar protective layer required.
Base cleaning ➔ Base marking ➔ Waterproof membrane laying ➔ Membrane overlapping ➔ Detail joint treatment ➔ Self‑inspection, repair & acceptance ➔ Steel reinforcement binding ➔ Concrete pouring
Enclosure structure construction (or formwork installation) ➔ Vertical base inspection & cleaning ➔ Membrane positioning & marking ➔ Waterproof membrane laying ➔ Membrane overlapping ➔ Detail joint treatment ➔ Self‑inspection, repair & acceptance ➔ Steel reinforcement binding ➔ Concrete pouring
‑When laying the first membrane, loosely lay it on base according to marked lines, with smooth polymer sheet side towards base and weather‑resistant granular layer towards constructors, then carefully correct membrane position. The overlap width of the second adjacent membrane along long edge with the first one is 70mm. Tear off release film at overlap area before operation to keep the lower part of overlap zone clean, dry and dust‑free. Lap two membranes together, proceed construction continuously and roll overlap edge firmly to ensure good bonding. ‑Repeat above steps until all horizontal membranes are laid. ‑The short‑edge overlap width of membrane is 80mm. Use special membrane adhesive or tape to compact and bond the overlap seam. Short‑edge overlap seams of two adjacent membranes shall be staggered by at least 600mm to avoid concentrated overlap seams.
‑When laying membrane on vertical surface, align membrane on base of enclosure wall according to marked lines, with smooth polymer sheet side towards enclosure and weather‑resistant granular layer towards structural concrete. Fix membrane on supporting surface of enclosure wall by mechanical fixing method. Steel nails shall be fixed at 50mm away from outer edge of reserved self‑adhesive side of membrane. According to site conditions, mechanical fixing shall be carried out every about 500mm along long edge of membrane. During construction, tear off release film on reserved self‑adhesive overlap edge of long side, and ensure all nail fixing points are covered by overlap edge of adjacent membrane. Roll with pressing roller at once after lapping to ensure tight sealing and bonding. ‑According to site conditions, mechanically fix the membrane every about 500mm along short edge, with nail fixing position 5mm away from outer edge of membrane. After nailing, bond and seal short‑edge overlap part with special membrane adhesive or tape, to ensure all nail fixing points are covered by overlap edge of next membrane.
Carefully inspect waterproof layer before steel reinforcement binding, formwork erection and concrete pouring. Repair damage in time when the leaking risk point be found. When repairing damaged points, cut membrane which size have to be bigger than than 150mm×150mm to cover damaged area, repair and seal with special membrane adhesive or tape to integrate with original waterproof layer. Pour structural concrete as soon as possible after membrane laying. Before concrete pouring, take measures to keep accepted membrane surface clean and free of sundries, so as to achieve effective bonding between membrane and concrete. Operate carefully during concrete pouring to prevent man‑made damage to membrane waterproof layer.
Products of different specifications shall be stacked separately without mixing during transportation and storage. Avoid sun exposure and rain, keep well ventilated. Storage temperature shall not higher 45℃. Stack height shall not exceed 5 layers for horizontally placed membranes, and single layer for vertically placed membranes. Prevent tilting and side pressure during transportation; cover with tarpaulin if necessary. Under normal transportation and storage conditions, the shelf life is at least 1 year from production date.
Recommended Products
Leave Us a Message
Official Account
Chengdu:Huaqiao City, Jinniu District, Chengdu, Sichuan Province•Creative CenterABuilding 21, Floor 21 Manufacturing Base:No. 56 Xingye 7th Road, Industrial Economic Development Zone, Dayi County, Chengdu, Sichuan Province
Chongqing:Fujia No. 176, Haier Road, Jiangbei District, Chongqing68号 Manufacturing Base:No. 289 Qingsong Road, Tianjia Industrial Park, Tongnan District, Chongqing
15228990208
National Consultation Hotline
028-87341118或15228990208
After-sales Service
400-0789-166
Copyright@ 2023 Sichuan Jinxing Waterproof Technology Group Co., Ltd. ShuICPBeian No. 2023005631-1
Baidu Baijiahao
Official Douyin
Mini Program Entry