PRODUCTS
Product Center
JX112 Butyl Self‑adhesive Thermoplastic Polyolefin (TPO) Waterproofing Membrane is mainly made of thermoplastic polyolefin (TPO), one‑side laminated with butyl self‑adhesive layer and release film. It features excellent weathering & aging resistance, high‑low temperature resistance, anti‑edge‑lifting property and outstanding waterproof performance.It s able to be installed by wet‑laid or dry‑laid method, firmly bonded to substrate to eliminate water channeling, as a new‑type eco‑friendly waterproofing membrane.
Waterproof for basement,subway,tunnel,swimming pool,roof,underground garage top slab and other project.

《Waterproofing Membranes with Self‑adhesive Layer》 GB/T 23260‑2009
‑Two installation methods: wet‑laid and self‑adhesive, adaptable to various construction environments. Easy application, strong substrate bonding and reliable waterproof performance. ‑TPO delivers superior flexibility for perfect conformity to substrate and full bonding. ‑Butyl rubber for self‑adhesive layer provides inherent waterproof capability, excellent weather and water resistance for construction under diverse conditions. ‑Long‑side lap joint adopts self‑adhesive process without hot‑air welding, which simplifies construction, shortens project duration and ensures stable quality. ‑Cold installation, no open flame, non‑toxic & odor‑free, zero pollution and fire hazard, safe and ecofriendly.
Base cleaning ➔ Substrate wetting ➔ Detail joint treatment ➔ Layout Reference Line ➔ Cement Slurry Mixing ➔ Membrane Laying ➔ Rolling & Air Venting ➔ Lap‑joint Sealing ➔ Membrane Terminal Sealing ➔ Self‑inspection & Acceptance ➔ Work Handover
Substrate Preparation ➔ Special Self‑adhesive Primer Application ➔ Detail Joint Treatment ➔ Layout Reference Line ➔ Waterproof Membrane Laying ➔ Lap‑joint Treatment ➔ Terminal Treatment ➔ Self‑inspection & Acceptance ➔ Work Handover
Substrate treatment: Remove dust and debris; pre‑wet dry substrate surface.
Special adhesive mixing: Cement : Water : Adhesive Powder = 100 : 40‑45 : 0.5. Put adhesive powder into mix‑up bucket first, add water under stirring, then add cement while stirring. Mix until lump‑free, sediment‑free and foam‑free.
Adjust adhesive thickness to 2‑3mm according to substrate flatness. Spread cement slurry within laying area; do not spread excessive area, lay membrane immediately after spreading.
Peel off release film on membrane bottom, lay membrane onto fresh cement mortar. Apply cement mortar and lay next membrane piece sequentially. Lay adjacent membranes in parallel butt‑joint schedule.
Beat and press membrane surface with wooden float or rubber plate to squeeze out trapped air, make membrane tightly bonded with mortar.
Open‑air curing: Leave for 24‑48 hours (time depends on ambient temperature; higher temperature leads to shorter curing time).
For vertical wall application: Temporarily seal membrane terminal with tape or thick cement mortar sealant to avoid rapid moisture loss.
Lap joint width ≥ 80mm, adopt membrane‑to‑membrane lap joint.
Substrate cleaning: Thoroughly clean substrate; keep substrate flat, clean and dry.
Apply primer: Roll‑on or spray primer evenly onto prepared substrate, avoid missing spots and bare substrate.
Install additional waterproofing layer: Prior to main membrane laying, install self‑adhesive additional layer (same material) at detail joints per specification & design requirements.
Snap layout lines: On dry prepared substrate, snap reference lines according to membrane width plus lap allowance for laying guidance.
Large‑area laying: Peel off bottom release film, lay membrane on dry substrate. Roll membrane surface gently to expel trapped air and achieve tight substrate contact. Adopt lap‑joint for adjacent membranes; recommended long‑side lap width: 80mm.
Remove release film from lower membrane lap edge, clean lap surfaces and complete lap bonding. Apply sealant if needed for tight lap sealing.
Store membranes in well‑ventilated place away from sunlight and rain. Storage temperature ≤ 45℃.Store different types & specifications separately. Flat stacking height ≤5 layers;store vertically in single layer.Keep away from acid, alkali, oil and organic solvents during transportation.Prevent tilting and crushing during transport; cover with tarpaulin if necessary. Shelf‑life is minimum 1 year under proper storage conditions.
Recommended Products
Leave Us a Message
Official Account
Chengdu:Huaqiao City, Jinniu District, Chengdu, Sichuan Province•Creative CenterABuilding 21, Floor 21 Manufacturing Base:No. 56 Xingye 7th Road, Industrial Economic Development Zone, Dayi County, Chengdu, Sichuan Province
Chongqing:Fujia No. 176, Haier Road, Jiangbei District, Chongqing68号 Manufacturing Base:No. 289 Qingsong Road, Tianjia Industrial Park, Tongnan District, Chongqing
15228990208
National Consultation Hotline
028-87341118或15228990208
After-sales Service
400-0789-166
Copyright@ 2023 Sichuan Jinxing Waterproof Technology Group Co., Ltd. ShuICPBeian No. 2023005631-1
Baidu Baijiahao
Official Douyin
Mini Program Entry